User Tools

Site Tools


ice:oem_integration

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
ice:oem_integration [2014/07/15 00:36] – [Thermal Management] Michael Radunskyice:oem_integration [2014/07/15 00:40] – [Overview] Michael Radunsky
Line 10: Line 10:
  
 Considerations for integrating the ICE Platform stack in an OEM situation are detailed in the remainder of this document. Important key points include deciding on the type and quantity of daughter modules to use and how that relates to the overall power budget for both the power supply and the maximum currents that can be routed through the power bus. The mechanics of mounting the circuit boards and designing a thermal management system must also be designed. Connections for communication and I/O from the circuit boards to the integrator's system are also detailed in the document. Considerations for integrating the ICE Platform stack in an OEM situation are detailed in the remainder of this document. Important key points include deciding on the type and quantity of daughter modules to use and how that relates to the overall power budget for both the power supply and the maximum currents that can be routed through the power bus. The mechanics of mounting the circuit boards and designing a thermal management system must also be designed. Connections for communication and I/O from the circuit boards to the integrator's system are also detailed in the document.
 +
 +Can't find what you are looking for?  A [[https://groups.google.com/forum/#!forum/vescent-ice-qa|forum]] has been established for Q&A and information dissemination.  We invite you to join.
 ===== Power Requirements ===== ===== Power Requirements =====
 ==== Power Entry ==== ==== Power Entry ====
ice/oem_integration.txt · Last modified: 2021/08/26 15:26 by 127.0.0.1